


Our factory located in Yongkang can produce over 45,000 cups per day. Its construction concept is simple: all the links in the cup production process are completed here. Processes such as stamping, vacuum welding, polishing, spraying, decoration, leakage testing and packaging are all carried out in a continuous flow manner to ensure that any non-conforming products can be detected and replaced in time before the cartons are sealed.
11 hydraulic presses, quick-change tooling, line conversion under 90 minutes.
8 automated welders pulling <0.05 Pa, locking in lifetime insulation performance.
Cleanroom-adjacent hall preventing dust contamination of color coats.
Silk-screen, laser engraving, sublimation and UV transfer — all in-house.
100% inspection on every unit before the carton is sealed.
Third-party inspection ready (SGS, TÜV, BV) before container loading.
Our 76,852-square-meter factory in Jiangsu has been manufacturing building-grade curtain walls and metal facades for 16 years. The same engineering discipline — strict tolerances, multi-stage quality control, and internal tools — is what we bring to every beverage order.


We'll walk you through the line on video call — bring your spec questions.